Two months ago, the
benchwork for the staging peninsula circling the workbench was in place.
Here come the tracks.
First, ensure that the tracks line up without any annoying kinks or seriously tight curves. Trust me, I've learned about that second challenge the hard way, more than once!
Here, a few sections of tie strip cannibalized from older Atlas flex track will serve as anchors for the handlaid turnouts to be built. A curved 83" with a 63" diverging route and two conventional No. 10 will bring the four staging tracks into one to cross the liftout section.
Here we are two weeks later, with the points and throw bars installed and most of the spiking done. Note that I use two strips of circuit board, one for the throw bar and another to hold the alignment. There is more fettling to do yet. I have hand-powered some cars through the special work, sometimes without incident. Good cars will run on questionable track, and questionable cars will run on good track. I'd rather get the track good as it's installed, and deal with the questionable cars from swap meets, of which there are many, later.
The connecting curve and lift-out section in place. There will be additional terrain to the right of that curve, to keep anything from going on the floor should the worst happen. There's another month of working time in advance of the Lombard O Scale show.