First, the falsework to support the plaster cloth along the wall, and the beginnings of a retaining wall at left. If I've done this correctly, the ditching I'm providing for will channel the water if something bad happens. The Gloucester Branch will make an S curve (it's the same way of gaining space you see on the Chicago Loop) in the foreground.
A few days later, there's more of the retaining wall in place (more sections to finish this, using Chooch peel-and-stick components, are on order) and the support for the plaster cloth is finished. It's thinking time, do I tackle this right now, or work from the top down, on the theory that some of the mess from above might be more easily tidied up with a less finished section here? Stay tuned.